
Stage 1: 16.2 Kw interconnected to CFE in medium voltage. Include saving and care of the environment in your annual planning.
Stage 2: 16.2 Kw interconnected to CFE. More than 555 Kw installed support us.
Installation of 16.2 kW for grid-tied at Hotel Caborca Inn.
Stage 1: 16.2 Kw interconnected to CFE in medium voltage. Include saving and care of the environment in your annual planning.
Stage 2: 16.2 Kw interconnected to CFE. More than 555 Kw installed support us.